Well, it's been almost 4 months since the last post and nothing new has been done to the cabrio.
Partly because I was moving and also that I don't really have a place to work and then safely store the car for the night in order to carry on the next day. To work on the car I have to rent a trailer and take it to the smallholding, work on it and then return it to storage for the night. Hopefully when I'm back home I'll be able to work something out as I would really like to finish this car in time for Ferdi's swop meet. There is still a lot to be done, so it will be a tight deadline. This is the list to get the car roadworthy and licensed.
1. Install master cylinder
2. Install new brake line
3. Clearance front calipers and mount
4. Fit brake pads front and back
5. Fit crystal headlights
6. Fit stainless firewall kit and insulation
7. Tighten rear axle nuts
8. Fill gearbox with oil
9. Install gauges and sensors
10. Check electrics and wiring
11. Buy and fit windscreen
12. Fit seatbelts
13. Modify side mirror mounts
14. Colour code and fit side mirrors
15. Fit window scrapers and rubbers
16. Turn rear suspension 1 spline
17. Fit steering and boss
18. Fit release bearing and guide tube
19. Fit Clutch and pressure plate
20. Fit Battery
21. Engine
22. RWC and license
Some cosmetics I would like to add
23. Stone guards and kickplates
24. Door and hood handle scratch guards
25. Alarm and central locking
26. Sound installation
27. Interior lights
28. Pedal covers
29. Center console
The last list can wait a while, at least I'll be able to drive the car. To tell the truth, looking at the list, I doubt if I'll be able to finish before end of Aug, as I'll only be able to start working around the 10th of Aug. That means more than 1 thing a day will have to be crossed of the list, but I'm going to give it a try.