Yesterday was d day for the floor I organised an early shift at work going underground at four but was home by 9 the first truck was already there. end of the day 12m3 of concrete laid in the worst wind Ive experienced in the northwest in my life.
Image
Image
Image
Image
we power floated the floor and it came out fairly well will still need to be sawed in blocks as the area is faar too big for a solid block
today the walls started going up
Image
regards
Armand
Image
Who cares how it's done in California? :twisted:
(018) 473-0186
User avatar
beetlepower
Twin Port
Posts: 1377
Joined: Tue Sep 20, 2005 12:16 pm
What model do you have?: Beetle, Squareback
Location: Pretoria
Has thanked: 3 times
Been thanked: 28 times
South Africa

The three hole garage

Post by beetlepower »

Awesome, you not wasting time...
'NO TYRE SHALL BE LEFT UNSMOKED'

0828378801
@reubenvn on twitter
https://www.instagram.com/elbowgreasemonkeyza/
ZeroAxe
Drive Train
Posts: 3004
Joined: Tue Feb 21, 2006 12:07 am
What model do you have?: FUmobile
Location: It doesn't matter.
Been thanked: 1 time

Re: The three hole garage

Post by ZeroAxe »

Image


I seriously hope this dude got his feet out of the cement before it dried! :shock:

How did you go about leveling the floor in two halves? (without 'damaging' the first half?) Did it set yet? Nice progress that you have got going there! before you know it the roof wil be up. Are you going to smooth the floor with one of those concrete 'helicopters' ?
VW Enthusiast
ImageImageImageImage
User avatar
IMPI
Donor
Donor
Posts: 1897
Joined: Wed Sep 14, 2005 9:01 pm
What model do you have?: sp2
Location: Orkney Northwest province
Has thanked: 1 time
Been thanked: 78 times

Re: The three hole garage

Post by IMPI »

Hi
The first lorry filled half of the floor. I put a temporary level for the floor down the middle by using a ten meter long piece of 75x75 square tubing. there was about 2 hours between the first and second lorry so the first half was semi set. we then poured the second half but left a 60cm channel down the middle once that side was level we filled the middle line. once everything was set we used the helicopter type thingy to smooth everything. does not look too bad
Armand
Image
Who cares how it's done in California? :twisted:
(018) 473-0186
calooker
Donor
Donor
Posts: 4973
Joined: Wed Sep 14, 2005 9:24 am
What model do you have?: 77 SP
Location: Johannesburg
Has thanked: 5 times
Been thanked: 98 times
Contact:
Portugal

Re: The three hole garage

Post by calooker »

Done some serious work :mrgreen: , good going.... but......not to burst your bubble, :shock: there is a few things that are not right, firstly the mesh sould not be sitting directly on the ground, it should have been raised of the ground at least 25-30mm (cover) as to get the max. effect of what the mesh is actually there to do, strengthen the surface bed and keep it from rusting, the next thing you have no plastic underlay, without the plastic the moisture is going to get to the mesh and it's going to rust & expand causing cracks in the surface bed you just laid and moisture on the edges is going to come thru the surface bed as well.
Hopefully you kept that surface bed wet or covered from the sun, as the curing after casting is the most critical stage for the lifespan of the surface bed.
My advice to you on the saw cuts, which should be done about 48 hours after casting should be in 2m X 2m pannels not more.
Maybe my advice is a little late, but may help someone else in future. :drunks:
For what it's worth, ignorance has no limits ......
User avatar
IMPI
Donor
Donor
Posts: 1897
Joined: Wed Sep 14, 2005 9:01 pm
What model do you have?: sp2
Location: Orkney Northwest province
Has thanked: 1 time
Been thanked: 78 times

Re: The three hole garage

Post by IMPI »

Hi Rui
Spot on on all your observations.
From the photos it seems that the mesh is not 30mm above the ground and this caused a lot of trouble to get right. I was using wheelbarrows (480 trips in all) and had to have the mesh on the ground for some of the time to allow the wheel barrows to pass. whilst the going was extremely slow it also gave us time to lift the mesh as we went along. Not ideal and probably not perfect either (the design did not call for any mesh at all) the reason for not putting a membrane under the concrete is from a course I did at the concrete institute which stated that if you cover the concrete on one side with an impermeable membrane drying will only take place from one side and curling may appear. From the manual: DPC's should therefore be specified only in cases wherethey are essential. I will be cutting the slots alittle after 48 hours purely due to logistics as working a full day and building at home is no fun.

Obviously I am not a proffesional and am taking risks with the job due to my own limited knowledge as well as trying to save on costs. I am currently standing at about R1300 per m2 which is a third of what I was quoted by the proffesionals.
I can also see where the money for a proffesional builder goes as there are lots of things I would do differently if I were to do this for a living. Example building a few scaffolds and placing a ladder on top of them to reach 5m above ground is no fun :roll:
Armand
Image
Who cares how it's done in California? :twisted:
(018) 473-0186
calooker
Donor
Donor
Posts: 4973
Joined: Wed Sep 14, 2005 9:24 am
What model do you have?: 77 SP
Location: Johannesburg
Has thanked: 5 times
Been thanked: 98 times
Contact:
Portugal

Re: The three hole garage

Post by calooker »

Yep.... building at home is allways a pain in the ass .... but as you say, DIY sure saves a lot of $$$$, in the end you going to be a very proud project manager :lol: :lol: :lol:
For what it's worth, ignorance has no limits ......
User avatar
Firebird
Oil Stain
Posts: 155
Joined: Wed Feb 27, 2008 11:45 pm
What model do you have?: 356Speedster Replica
Location: Gauteng
Has thanked: 28 times
Been thanked: 11 times
Contact:
South Africa

Re: The three hole garage

Post by Firebird »

That looks great!!
User avatar
IMPI
Donor
Donor
Posts: 1897
Joined: Wed Sep 14, 2005 9:01 pm
What model do you have?: sp2
Location: Orkney Northwest province
Has thanked: 1 time
Been thanked: 78 times

Re: The three hole garage

Post by IMPI »

Quite a bit has happened since my last post. the walls have gone up and currently only the west gable needs completion. we also installed the mezzanines floor joists and this coming week the roof should go on.
work that has happenned the floors were sawn and polyurethane sealing compound installed,
Image
Image
Image
The roof support crosses were manufactured and installed
Image
Image
I decided to close the center of the cross with a domed cap
Image
The walls went up
Image
Image
Image
currently we are here
Image
Image
Image
Image
And that is mee standing on the mezanine steel
This week will be electrcal instalations and the finishing of the gable and hopefully the roof
Armand
Image
Image
Who cares how it's done in California? :twisted:
(018) 473-0186
Bugger
Advertiser
Advertiser
Posts: 7948
Joined: Fri Jun 09, 2006 6:25 pm
What model do you have?: a Few Models
Facebook: Pierre Bugger Eksteen
Location: Johannesbirg
Has thanked: 18 times
Been thanked: 58 times

Re: The three hole garage

Post by Bugger »

:hangloose: :hangloose: :hangloose: :hangloose: Mooi man die cave is comming together
Adapterplates Available for Rotary in Beetle and others aswell
And Special Boxes built for Rotary Conversions and Scubies
Pierre
082 600 8663

CLick on Banner Below to be routed to the Web site

Image
User avatar
retrovan
Donor
Donor
Posts: 8710
Joined: Mon Feb 07, 2011 8:51 pm
What model do you have?: 52T1,68FB,72Bay,75FL
Location: Eich! no, in Jefferys Bay
Has thanked: 421 times
Been thanked: 541 times
Contact:
Netherlands

Re: The three hole garage

Post by retrovan »

Well Done Armand..
Once the hard work is done....
The joy of moving in......
Looks good.......
1952 Split Beetle 1835cc
1968 Fastback 2Lt.type4
1972 Low Light Bay Panel Van 2Lt type 4
1975 Fleetline Panel Van 1914cc
2020 MeFusco Beetle Truck 2Lt type 4
1972 FT Hahn SP 1776 cc
calooker
Donor
Donor
Posts: 4973
Joined: Wed Sep 14, 2005 9:24 am
What model do you have?: 77 SP
Location: Johannesburg
Has thanked: 5 times
Been thanked: 98 times
Contact:
Portugal

Re: The three hole garage

Post by calooker »

Armand the local Contractor :D good work, now :drunks:
For what it's worth, ignorance has no limits ......
flatfourfan
Full-time Bug Nutter
Posts: 4195
Joined: Tue Nov 08, 2005 12:06 pm
What model do you have?: Speedster Replica
Location: Pretoria
Has thanked: 36 times
Been thanked: 50 times

Re: The three hole garage

Post by flatfourfan »

the monster...........she's alive.........you're gonna have that roof up in time for the rainy season, good planning.
User avatar
CooP
Clutch
Posts: 680
Joined: Thu Jan 08, 2009 9:52 pm
What model do you have?: '71/72 Hybrid Westy
Location: Fairland, Randburg
Has thanked: 13 times
Been thanked: 8 times
Contact:
South Africa

Re: The three hole garage

Post by CooP »

Excellent stuff, well done so far!
Size does matter
User avatar
karmakoma
Full-time Bug Nutter
Posts: 4126
Joined: Sat Mar 29, 2008 9:11 pm
What model do you have?: 69 dual trunk coupe
Location: Gauteng
Has thanked: 1 time
Been thanked: 8 times

Re: The three hole garage

Post by karmakoma »

Wow, do you take on work out of town ? :-) I need one of those! :hangloose: